How can a lightweight and level floor be created quickly if the substrates is uneven and problematic? With the UZIN Turbolight System.

Refurbishments often mean unexpected challenges for craftsmen and planners. Limited load or installation heights and suspended ceilings, for instance, require an adequate floor construction. The Turbolight®-System from UZIN rectifies level variations (from 5 mm to 300 mm) across large areas and the area loads on the supporting substrate are only roughly one third of the load of conventional screeds (approx. 100 kg / m2 at 5 cm thickness). Compared to cementitious screeds the UZIN Turbolight®-System is ready for covering 3 to 4 weeks earlier. Textile and elastic floor coverings as well as wood flooring can be installed on the system using the standard methods. With 10 dB the system can provide remarkable sound insulation which is important in the renovation of old buildings 4 cm thickness according to DIN EN ISO 140-8).

Prime the prepared substrate with UZIN PE 360 using the UZIN nylon fibre roller. Alternatively, installation on a separating layer is also possible; the minimum thickness of UZIN SC 914 Turbo is then 3 cm.

Prime the prepared substrate with UZIN PE 360 using the UZIN nylon fibre roller. Alternatively, installation on a separating layer is also possible; the minimum thickness of UZIN SC 914 Turbo is then 3 cm.

Position at least 8 mm thick foam expansion stripsaround all vertical building elements such as walls, supports, pipes, platforms, door frames, etc. This prevents acoustic bridges and stresses resulting from rigid bonding to other building elements.

Position at least 8 mm thick foam expansion stripsaround all vertical building elements such as walls, supports, pipes, platforms, door frames, etc. This prevents acoustic bridges and stresses resulting from rigid bonding to other building elements.

Empty 2 full sacks of UZIN SC 914 Turbo in the mixer. Now add the required quantity of water (approx. 20 litres) and mix for two minutes. Finally pump to the workplace and apply quickly.

Empty 2 full sacks of UZIN SC 914 Turbo in the mixer. Now add the required quantity of water (approx. 20 litres) and mix for two minutes. Finally pump to the workplace and apply quickly.

After mixing, the screed should be spread to the desired thickness using a rake and screed trowel before being and drawn level using a screeder bar.

After mixing, the screed should be spread to the desired thickness using a rake and screed trowel before being and drawn level using a screeder bar.

The surface is slightly compressed with the smoothing edge or trowel. For uneven substrates it is possible to compress and spread to thicknesses of approx. 5 mm without a problem.

The surface is slightly compressed with the smoothing edge or trowel. For uneven substrates it is possible to compress and spread to thicknesses of approx. 5 mm without a problem.

Roll out UZIN RR 201 renovation fleece onto the hardened surface of UZIN SC 914 Turbo after waiting at least 24 hours* and then cut to size with scissors. Lay the fleece loosely over the whole surface with at least 2 cm overlap between lengths.

Roll out UZIN RR 201 renovation fleece onto the hardened surface of UZIN SC 914 Turbo after waiting at least 24 hours* and then cut to size with scissors. Lay the fleece loosely over the whole surface with at least 2 cm overlap between lengths.

Mix UZIN NC 157 thin screed with clear, cold water and apply 20 kg/m2 with a smoothing trowel. Do not aerate thin screed.

Mix UZIN NC 157 thin screed with clear, cold water and apply 20 kg/m2 with a smoothing trowel. Do not aerate thin screed.

Textile and elastic floor coverings as well as wood flooring may be installed using the standard methods once the screed has fully hardened (at 20 °C and 65 % relative humidity).

Textile and elastic floor coverings as well as wood flooring may be installed using the standard methods once the screed has fully hardened (at 20 °C and 65 % relative humidity).