RENOPLAN SYSTEM 15

How can time be saved when refurbishing floors with old adhesive residues? With UZIN L3 Gold.

UZIN L3 Gold can be used over most waterproof adhesive residues such as bitumen, if sound and well bonded to the substrate. It is also extremely rapid drying and most floor coverings can installed after just 2 hours! UZIN L3 Gold is no ordinary bag & bottle smoothing compound as it provides superior performance combined with its extremely low curing stress. It has the added bonus of a minimum 25 N compressive strength. Lower strength smoothing compounds are susceptible to indentations that will mirror in the floor covering, especially if there is heavy traffic and trolley transportation. The liquid component is also contained in recyclable packaging making it much better for the environment compared to plastic bottles. UZIN L3 Gold. Harder. Better. Faster. Stronger.

<p>The substrate must be sound, load-bearing, dry, free from cracks, and clean. Remove any materials that could impair adhesion such as laitance, loose residues of adhesives or coatings by brushing, grinding or shot-blasting.</p>

The substrate must be sound, load-bearing, dry, free from cracks, and clean. Remove any materials...

<p>Thoroughly vacuum any dirt and dust with an industrial vacuum cleaner.</p>

Thoroughly vacuum any dirt and dust with an industrial vacuum cleaner.

<p>Mix UZIN L3 Gold Powder and UZIN L3 Gold Liquid together until smooth and free from lumps.</p>

Mix UZIN L3 Gold Powder and UZIN L3 Gold Liquid together until smooth and free from lumps.

<p>Apply the smoothing compound over the floor using a screed rake or steel trowel at depths from 1 mm to 5 mm. Remove any air using a spike roller. After drying for only 2 hours it should be ready to accept most floor coverings.*</p>

Apply the smoothing compound over the floor using a screed rake or steel trowel at depths from 1 mm...

<p>Choose a suitable adhesive for installing the floor covering such as UZIN KE 2000 S for PVC. Apply evenly onto the substrate using a suitable notched trowel and then install the floor covering. Finally roll over the floor covering
using a pressure roller.</p>

Choose a suitable adhesive for installing the floor covering such as UZIN KE 2000 S for PVC. Apply...

*Under normal conditions at 20°C and 65% relative humidity. See product data sheets for more information.